A Week of Aftermaths

Heading into next week, keep this in mind:

Of Course…

Most from PowerLine and Bookworm, as usual.

 

Advertisements

About NEO
Lineman, Electrician, Industrial Control technician, Staking Engineer, Inspector, Quality Assurance Manager, Chief Operations Officer

7 Responses to A Week of Aftermaths

  1. the unit says:

    So funny to me, just yesterday after a full weeks job of installing grab bars in two baths, a tile shower and a tile tub/shower. A full week ’cause being sure I’d located the studs behind the tile. You know, finally having the “balls” to drill holes in the tile. 🙂
    And this is true too. Recently my kidney doc told me I needed to drink more. So I bought a fifth, actually a liter, on my way home. 🙂

    Liked by 1 person

    • NEO says:

      I thought of you when I saw that one! 🙂

      Liked by 1 person

      • the unit says:

        Now gotta check in at Amazon to see about ordering those seals for my shower. 🙂

        Like

        • NEO says:

          🙂

          Like

  2. the unit says:

    CNN this Sunday morning, just announced Trump lied 22 times in 51 minutes.
    Natural policy. Politically too. 🙂

    Liked by 1 person

    • NEO says:

      That’s nice. Last time I watch CNN, I swear they lied 51 times in 22 minutes, not including commercials, 🙂

      Liked by 1 person

  3. Pingback: A Week of Aftermaths via NEO | Boudica2015

Leave a Reply

Please log in using one of these methods to post your comment:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.